Tag «Full Capacity»

Operation of Power Transmission Lines in Full Capacity

The total length of transmission lines at the voltage level of 220 KV and above in the country is 2,74,588 (circuit kilometers) and the total capacity of sub-stations of the transmission system at 220 KV and above voltage level is 473216 MVA as on 31.03.2013. The transmission lines are allowed to be loaded to their …