Jawaharlal Nehru National Solar Mission sets target of 20,000 MW of grid connected solar power by 2022
The Minister of New and Renewable Energy, DR. Farooq Abdullah informed Rajya Sabha today that Jawaharlal Nehru National Solar Mission has set a target of installed capacity of 20,000 MW of grid connected solar power by 2022. The grid connected solar power projects under Batch-I&II, Phase-I of JNNSM have been allocated through bidding process. The …