Tag «sinter plant»

Primetals Technologies receives first order for a selective waste gas recirculation system (SWGR) for a sinter plant in China

• Waste gas recirculation rate up to 40 percent • Reduces waste gas emissions to atmosphere by 770,000 m³/h • Reduces coke consumption for sintering by approximately 5 percent • Downstream gas cleaning facilities can be designed 30 percent smaller due to reduced waste gas flow rate Chinese steel producer Shandong Iron & Steel Corporation …

BLUESCOPE RESTART OF THE PORT KEMBLA STEELWORKS SINTER PLANT

BlueScope has restarted the Sinter Plant at the Port Kembla Steelworks after obtaining necessary approvals from the NSW EPA. This will enable the production of iron and steel at the Steelworks to continue without interruption. The Sinter Plant will be operating under a temporary reconfiguration until the Waste Gas Cleaning Plant can be recommissioned, which …

PORT KEMBLA STEELWORKS WASTE GAS CLEANING PLANT STACK FIRE

Around 5:30pm yesterday afternoon there was a fire at the Waste Gas Cleaning Plant stack located in the Sinter Plant at the Port Kembla Steelworks. Emergency services responded quickly and controlled the fire. All employees and contractors are safe and there were no injuries. The fibreglass stack eventually collapsed from the fire. Due to the …